NewExplore 156M+ parcels on the interactive map. Free, no account required.Open the map →

SiteFacts

Free tool

Land Development Cost Calculator

Fees for permits, power, water and wastewater sit on separate county, city and utility pages. Enter an address and answer 4 questions to get a ballpark for each, a start on the cost to develop land, with the basis shown.

The SiteFacts Land Development Cost Calculator gives a ballpark budget for building permits, power, water and wastewater at a U.S. address, for early planning. Each line starts from the typical cost for your area and is shown as a range of plus or minus 20%. It takes about 2 minutes and does not price site work such as clearing, grading or driveways.

  • Free, no email needed
  • Every line shows its basis
  • Local fees, sourced where published
  1. 1. Address
  2. 2. Your lot
  3. 3. Budget

How this estimate works

1. Find your county and city

We start with your address and ask the U.S. Census Bureau's address lookup tool for the county, state, and city or unincorporated area. You confirm it before anything is researched.

2. Research local fees

An AI researcher searches the web for published local fees for four lines: building permits, power connection, water, and wastewater. When no local number is published, the line uses typical costs for the region and says so.

3. Show the basis

Every line carries a label: Sourced, Regional estimate, or Not available. Sourced and Regional lines start from one typical figure and are shown as a range of plus or minus 20%, which is how the range is built and not a measure of how close real costs will land. Sourced lines link to the page they came from, and Not available lines show no number.

What it can't tell you

This tool prices four lines and nothing else. The free Land Buyer’s Field Guide covers what this calculator can't: access, zoning, flood zone, wetlands, and the questions to ask before you make an offer.

Common questions

How close is this to what I'll actually pay?
It is a ballpark for early planning, not a quote. Each line is built as the typical cost for your area, plus or minus 20%, so real quotes can come in above or below the range. A site with rock, slope, a long driveway or an engineered septic system can cost much more. Get quotes from the utility and 3 or more local contractors.
How much does it cost to get utilities on land?
It varies widely by county, utility, distance from existing lines and the site itself. Connection charges, the length of line or trench to your building site, and each utility's own fees drive the cost. The calculator gives a ballpark for power, water and wastewater at a specific address in about 2 minutes. Get quotes from the utility and local contractors.
What do a well and septic system cost?
It varies widely by county, well depth and soils. A well depends on water depth, and a septic system depends on what the soil allows. What system a lot can use is decided locally, so confirm with your county or local health department. An engineered system can cost much more. The calculator gives a ballpark for your address in about 2 minutes, assuming a conventional gravity system, and does not check whether your lot can use one. Get quotes from local contractors.
Where do the numbers come from?
They come from published fee schedules and utility pages for your county, city or utility, found by searching the web once your address is confirmed. When no local number is published, the line uses typical costs for the region and is labeled Regional estimate. Lines built from published pages are labeled Sourced and link to the page, so you can check the number yourself.
Why is a line marked Regional estimate or Not available?
A line is marked Regional estimate when no published local number was found, so the tool uses typical costs for the region. It is marked Not available when the line could not be estimated at all, and it stays blank instead of showing a default, because a guess that looks like a fact is worse than a gap. The local permit office or utility can fill it in.
Does the calculator cover clearing, grading or driveways?
No. It covers building permits, power connection, water and wastewater only. It leaves out clearing, grading, driveway or road work, excavation, foundation, soil or perc testing, engineered or advanced septic systems, and survey. Those depend heavily on the site, so get quotes from local contractors before you rely on any total.
How is this different from a SiteFacts Report?
The calculator gives a ballpark range for four cost lines from public information. A SiteFacts Report is an analyst verified file on one property, with utilities context and the permit pathway, and every finding is cited to its official source. Use the calculator while you compare lots, and order the Report when you are ready to commit money to one.
Do I have to give my email to see the results?
No. The full breakdown shows on the page without an email, and the calculator is free. Email is optional. If you enter it, we send you a copy of the breakdown, and someone from SiteFacts may reach out about your lot. Results for the same address and answers are saved for 30 days.